Skip to content

Cloud Architecture & Migration

Assessment, architecture, migration, and tuning across Azure, AWS, and GCP. We move estates in controlled waves, with rollback planned before every cutover.

The governed landing zone

ON-PREMISESGOVERNED LANDING ZONECLOUDSYour teamsproductdataplatformIdentity & accessSecurity & policyFinOps & taggingNetworkingAzureAWSGoogle Cloud

One governed zone: the same guardrails on every cloud.

Cloud estates often grow faster than the architecture behind them. The result is fragmented environments, climbing costs, and legacy workloads that are risky to move and expensive to keep. Without a clear target, teams face downtime risks, security gaps, and infrastructure that costs more than it should and delivers less than it could.

Our approach

We start by assessing the estate you run: infrastructure, applications, and the business constraints around them. From there we design a target architecture and move workloads in controlled phases, each with a rollback point, so performance, security, and cost hold from the first cutover.

  1. 01

    Landscape audit

    Inventory the estate: applications, dependencies, data flows. Rank workloads by migration risk and business value.

  2. 02

    Target architecture

    Draw the landing zone: network topology, identity, cost guardrails, sized to your objectives, not a vendor's reference deck.

  3. 03

    Phased migration

    Move workloads in controlled waves with rollback points, validating performance and cost after each cutover.

  4. 04

    Steady-state tuning

    Right-size what the move revealed: reserved capacity, autoscaling policies, and the runbooks your team operates with.

Migration in controlled waves

Three migration waves overlap four engagement phases (audit, pilot, core waves, steady state), and each wave ends at a validated rollback gate before the next begins.

  • Pilot wave: lowest-risk workloads
  • Core systems
  • Remaining estate
  • Rollback gate: no cutover is final until validated

The wave plan is drawn to your estate during the audit; count and cut differ per engagement.

Deliverables

  • Current-state infrastructure assessment report
  • Target architecture blueprint and migration roadmap
  • Automated infrastructure-as-code deployment templates
  • Post-migration performance and security validation
  • Operational runbook and knowledge transfer documentation

Technologies & certifications

Technologies

  • Azure
  • AWS
  • GCP
  • Terraform
  • Kubernetes

Certifications

  • Azure Solutions Architect Expert
  • Azure Administrator Associate

Engagement options

Three ways to work with us. The problem decides which fits.

Fixed-Price Assessment

A scoped engagement with clear deliverables, timeline, and fixed cost. Ideal for initial assessments and proof-of-concept projects.

T&M Consulting

Time-and-materials engagement for ongoing advisory, architecture reviews, and implementation support.

Continued support

A defined, renewable support period after handover. We stay to see it through, until your team no longer needs us.

Frequently asked questions

Do you support all major cloud providers?
Yes. We work across Azure, AWS, and GCP. Our certifications run deepest on Azure and our delivery record covers all three, so we can recommend the best fit for your operations, or optimize a multi-cloud setup.
How do you handle data residency and compliance requirements?
We design architectures that comply with regional data protection regulations: GDPR, APPI, NIS2, and others. This includes selecting the right data center regions, configuring encryption, and setting up data classification and access controls.
What's the typical timeline for a cloud migration?
A typical assessment takes 2 weeks. Full migration timelines range from 4-12 weeks depending on scope, number of workloads, and complexity. We always start with a fixed-price assessment before committing to a migration plan.
Can you work across different timezones?
Yes. We work across APAC and European time zones daily, and with US teams as needed. Key sync meetings land in agreed overlap windows.

Talk it through

Tell us about your environment and goals. We'll outline a practical path forward.

Discuss your cloud needs

Response: within one business day